PILOT PROGRAM

A 90-day pilot that proves condition monitoring on your equipment

Rotating equipment takes weeks or months to show signs of failure, so the pilot runs long enough to see it. You pick the assets, we agree the success criteria up front, and the final review gives you a cost/benefit analysis and a deployment estimate.

Up to 90 days

Of asset monitoring

25 to 50

Assets recommended

5 criteria

Agreed before installation

Objectives

What the pilot has to show

Detect potential failures

On your rotating equipment, confirmed by your technicians.

Fit your site network

Deployed into the existing network and installed on the target assets.

Work for your team

Easy for maintenance teams to install, use and respond to.

Pay for itself

Cost benefits your operation can measure and defend.

Success criteria

How each objective is validated, and by whom

Results are captured during the pilot and reviewed together at the end.

Success criterionValidation methodEvaluators
Alerts detect potential failures on monitored equipmentApp alerts plus manual inspection of the equipmentTechnician, project lead
Meets IT network and security requirementsSolution architecture reviewIT manager
Monitoring data integrates into your CMMS or data platformSolution integrationIT manager
Easy to install and scale with the maintenance teamDevices installed with the mobile appTechnician, project lead
Delivers return on investmentCost/benefit analysis and tracked unplanned downtime costProject lead

Scope

What goes into the pilot

Duration: up to 90 days

Rotating equipment typically takes weeks or months to show signs of potential failure.

Site: selected together

A site with high production output, a focus on uptime and a reliable network for the gateways.

Assets: 25 to 50

  • Critical continuous or intermittent rotating equipment
  • End-of-life assets
  • Assets with a history of high failure rates

Roles

Who does what

Executive sponsor

  • Lines up the resources the pilot needs
  • Reviews outcomes and sets direction for deployment

Maintenance technician

  • Installs sensors and gateways
  • Responds to and closes alerts in the app
  • Inspects each alerted asset and confirms early signs of failure

Project manager

  • Coordinates IT and site teams
  • Evaluates data collection and capabilities
  • Collects cost metrics for the business case
  • Orders devices

IT manager

  • Sets up cloud accounts for monitoring users
  • Sets up the monitoring project
  • Configures the site network for the devices

Phases

Four phases, start to finish

  1. 115 to 30 days

    Pilot preparation

    • Define scope and select target assets
    • Align stakeholders on objectives
    • Configure the site network for gateways
    • Set up accounts, users and app access
    • Purchase devices
  2. 21 to 2 days

    Installation

    • Confirm user access to the mobile app
    • Install sensors and set up gateways
    • User training
  3. 360 to 90 days

    Asset monitoring

    • Bi-weekly group calls
    • Alarm and data collection review
    • Document confirmed issues and downtime cost savings
  4. 45 days

    Final review

    • Summarize pilot results
    • Cost/benefit analysis
    • Review deployment estimates

Commissioning

Sensor and gateway commissioning, the practical way

  1. 1

    Unbox in the office

    Open the hardware somewhere with a desk and power, not on the plant floor.

  2. 2

    Number every sensor

    Label each sensor with a number. A marker works. It is how you find the right one later.

  3. 3

    Check connectivity

    Make sure the mobile device used for commissioning has internet access.

  4. 4

    Commission gateways first

    Commission each gateway near its internet source.

  5. 5

    Commission and name sensors

    Set each sensor's position name in the app to the number written on it.

  6. 6

    Install at the failure point

    Bond each sensor at the bearing or gearbox with the recommended adhesive pattern, then check signal strength. -40 to -75 dBm is good. Weaker than -75 dBm, move the gateway closer or remove obstructions.

Questions about the pilot

How long does the pilot take?

Up to 90 days of monitoring, plus 15 to 30 days of preparation, 1 to 2 days of installation and a 5-day final review.

How many assets should we monitor?

We recommend 25 to 50: critical rotating equipment, end-of-life assets and assets with a history of failures.

Does the pilot connect to our CMMS?

It can. A typical pilot scope is CMMS work-order integration plus one data source, such as a PI historian or OEE system, in the first 90 days.

Start with the assessment

The pilot plan comes out of the free assessment, so the assets and success criteria are yours from day one.